9 September 2026 Environment

RESTORING MONTRÉAL’S RIVERBANKS IN A CHANGING CLIMATE: A STRATEGIC, ECOLOGICAL AND SOCIAL COMMITMENT

Montréal is restoring degraded riverbanks using Nature-based Solutions, stabilising erosion-prone waterfronts.

 

Montréal is restoring degraded riverbanks using Nature-based Solutions, stabilising erosion-prone waterfronts while enhancing biodiversity, improving public access to water, and strengthening climate resilience across the city’s extensive park network.

Launched in 2021, the Riverbank Rehabilitation Program uses bioengineering techniques with native vegetation to restore eroded riverbanks across major parks. Supported by scientific research and pilot projects, it improves ecosystem health, reduces climate risks such as flooding and erosion, and creates safer, more accessible waterfront spaces for residents.

Challenge

  • 10 km of riverbanks identified as severely eroded in 2015.
  • Increasing erosion linked to flooding events (2017 and 2019).
  • By 2020, approx. 725 metres of riverbanks inaccessible due to safety concerns.

Delivered / achieved

  • Pilot restoration project delivered in 2024 using nature-based techniques.
  • 74% survival rate of planted vegetation after one year.
  • Up to 91% survival for key willow species in river-edge conditions.

Impact / approach

  • Nature-based bioengineering techniques used to stabilise erosion and restore habitats.
  • 13 native plant species tested to improve biodiversity and resilience.

Image 01: After spring flooding, a significant portion of the large parks’ riverbanks became inaccessible to the public due to safety concerns (Ville de Montréal)

Image 02: A mixed group of research and field experts confirmed the feasibility of bioengineering and hybrid techniques in Montréal’s specific conditions. (Ville de Montréal)

Image 03: Quality access points to water offer citizens the opportunity to practice outdoor activities favourable to their wellbeing while protecting ecological integrity of riverbanks. (Yves Kerouack)

Image 04: Native vegetation was planted to restore the eroded area and enhance fish habitat. (Ville de Montréal)

Image 05: An international team of researchers and bioengineering professionals worked to evaluate the applicability of bioengineering techniques to restore degraded riverbanks in Montréal’s large parks (Ville de Montréal)

9 September 2026